Jump to content
Customer Service 866.965.0400

OracleDBA

Members
  • Posts

    1
  • Joined

  • Last visited

  1. I feel I enjoyed 100% success applying Adam's Graphene to my motorcycle two coats over a 48 hr window. I wish to minimize the "cure time" to reach the "no weather restrictions" state. I have the luxury of being able to store bike in a small room with both a vent and electric space heater capable of holding room at any temp I want up to 104. Given the above, my questions are: a) if I do nothing and bike is held at room temp of apx 65 degrees what is my ETA to being fully cured with zero weather restrictions. I think the answer is 7 days to reach zero weather restrictions. b) If I am able to store bike being held at 85 degrees does the above drop in 1/2 to now become 3.5 days? c) If I am able to store bike being held at 100 degrees does the above drop in 1/2 again to now become 2 days? the above assumes ambient humidity is 50% or less.
×
×
  • Create New...